Construction of the pedestrian bridge that collapsed and killed six people in the Miami area was behind schedule and millions over budget, in part because of a key change in the design of its main support tower.http://www.heraldscotland.com/news/16101149.___Key_design_change____for_bridge_that_collapsed_in_Miami/